BigBloc commences work on the 2nd Phase of AAC Blocks expansion at Wada

Company to invest around Rs. 30 crore for doubling the production capacity of AAC block at Wada Plant to 5 lakh cubic meter per annum Surat (Gujarat) [India], December 6: Bigbloc Building Elements Pvt Ltd, wholly owned subsidiary of BigBloc Construction Limited, one of the largest manufacturers of Aerated Autoclaved Concrete (AAC) Blocks, Bricks and [...]

ST Correspondent
ST Correspondent Verified Media or Organization • 16 Apr, 2026 Super Admin
Dec 6, 2023 • 1:01 PM
B
Business
NEWS CARD
Logo
BigBloc commences work on the 2nd Phase of AAC Blocks expansion at Wada
“BigBloc commences work on the 2nd Phase of AAC Blocks expansion at Wada”
Favicon
Read more on en.sangritimes.com
6 Dec 2023
https://en.sangritimes.com/bigbloc-commences-work-on-the-2nd-phase-of-aac-blocks-expansion-at-wada
Copied
BigBloc commences work on the 2nd Phase of AAC Blocks expansion at Wada
BigBloc commences work on the 2nd Phase of AAC Blocks expansion at Wada

Company to invest around Rs. 30 crore for doubling the production capacity of AAC block at Wada Plant to 5 lakh cubic meter per annum

Surat (Gujarat) [India], December 6: Bigbloc Building Elements Pvt Ltd, wholly owned subsidiary of BigBloc Construction Limited, one of the largest manufacturers of Aerated Autoclaved Concrete (AAC) Blocks, Bricks and Panels in India has initiated work on the 2nd phase of AAC blocks plant at Wada in Palghar, Maharashtra. Company aims to double the production capacity of Wada plant to 5 lakh cubic meter per annum of AAC blocks from existing 2.5 lakh cubic meter per annum.

history This is an archived post. The information provided may be outdated.

ST Correspondent Verified Media or Organization • 16 Apr, 2026 Super Admin

Sangri Times Correspondent Desk

home Home amp_stories Web Stories local_fire_department Trending play_circle Videos mark_email_unread Newsletter