Indian Tunnel Rescue Team Begins Recce in Flood-Hit Nepal

Indian technical team begins reconnaissance of Trishuli 3A hydropower tunnels in Rasuwa to aid rescue of people trapped after Nepal's devastating Bhote Koshi floods.

Raaisha Upadhyay
Raaisha Upadhyay Verified Public Figure • 08 Aug, 2026 Journalist
Aug 29, 2026 • 8:12 PM
I
India
NEWS CARD
Logo
Indian Tunnel Rescue Team Begins Recce in Flood-Hit Nepal
“Indian Tunnel Rescue Team Begins Recce in Flood-Hit Nepal”
Favicon
Read more on en.sangritimes.com/s/b81425
29 Aug 2026
https://en.sangritimes.com/s/b81425
Copied
Indian Tunnel Rescue Team Begins Recce in Flood-Hit Nepal
Indian Tunnel Rescue Team Begins Recce in Flood-Hit Nepal

Key Highlights

  • A specialised Indian technical team has begun on-site reconnaissance of hydropower tunnels in Nepal's flash flood-affected areas.
  • The 11-member team includes doctors, paramedics and tunnel rescue specialists sent at Nepal's request.
  • The team has reached Trishuli 3A Hydropower Project in Rasuwa where people are believed trapped inside a tunnel.
  • 934 people associated with 11 hydropower projects in Rasuwa and Nuwakot remain out of contact.
  • The August 26 floods impacted 13 hydropower projects with combined 675.6 MW capacity.

India's humanitarian response to Nepal's devastating flash floods has taken a decisive step forward. A specialised technical team from India has begun on-site reconnaissance of hydropower tunnels in Nepal's flash flood-affected areas to facilitate the search and rescue of people believed to be stranded inside those tunnels, the Indian Embassy in Nepal confirmed on Saturday. The mission marks one of the most complex and technically demanding phases of the ongoing rescue effort — and one that could prove decisive for the hundreds still missing.

An 11-Member Specialist Team on the Ground

India sent an 11-member rescue team comprising doctors, paramedics and personnel specialising in tunnel rescue operations at Nepal's specific request. That composition itself is significant. The team is not designed for surface-level relief operations — it is engineered for the exact set of scenarios unfolding inside the hydropower projects hit hardest by the disaster.

Raaisha Upadhyay Verified Public Figure • 08 Aug, 2026 Journalist

home Home amp_stories Web Stories local_fire_department Trending play_circle Videos mark_email_unread Newsletter