Ropeway Operations Resume at Gangtok, was Shut for Scheduled Annual Maintenance: Damodar Ropeways

Normal ropeway operations resumed at Gangtok on the 11th of December for half of the day and became fully operational from the 16th of December, Damodar Ropeway said in its release today. It was shut down for 16 days for scheduled annual maintenance from the 25th of November to the 15th of December, 2022, with a few trial runs. Gangtok...

NewsVoir
NewsVoir Verified Media or Organization • 05 May, 2026 Agency
Jan 5, 2023 • 1:57 PM
B
Business
NEWS CARD
Logo
Ropeway Operations Resume at Gangtok, was Shut for Scheduled Annual Maintenance: Damodar Ropeways
“Ropeway Operations Resume at Gangtok, was Shut for Scheduled Annual Maintenance: Damodar Ropeways”
Favicon
Read more on en.sangritimes.com
5 Jan 2023
https://en.sangritimes.com/ropeway-operations-resume-at-gangtok-was-shut-for-scheduled-annual-maintenance-damodar-ropeways
Copied
Ropeway Operations Resume at Gangtok, was Shut for Scheduled Annual Maintenance: Damodar Ropeways

Normal ropeway operations resumed at Gangtok on the 11th of December for half of the day and became fully operational from the 16th of December, Damodar Ropeway said in its release today. It was shut down for 16 days for scheduled annual maintenance from the 25th of November to the 15th of December, 2022, with a few trial runs.

Gangtok Ropeways

history This is an archived post. The information provided may be outdated.

NewsVoir Verified Media or Organization • 05 May, 2026 Agency

NewsVoir is a press-release and corporate-communications distribution service. Content under this byline is sponsored / press-release material provided by third parties and does not reflect the editorial opinion of Sangri Times.

home Home amp_stories Web Stories local_fire_department Trending play_circle Videos mark_email_unread Newsletter